The Preliminary Specification Part CCXXI (AV Part XII)
When we talk about the capabilities of the innovative oil and gas producer. The Accounting Voucher module of the Preliminary Specification doesn’t necessarily come immediately to mind. Yet it is an important element in the capabilities that we have been detailing here in the Preliminary Specification. Particularly when we are moving to the “decentralized production” model from the “high throughput production” model that the industry is currently configured as.
In a world of decentralized production, most costs are variable costs; so, when variations or interruptions in product flow interfere with output, costs decline more or less in line with revenues. But when high-throughput production is accomplished by means of high-fixed-cost machinery and organization, variations and interruptions leave significant overheads uncovered. p. 58
In other modules we have detailed how the overhead costs of production, revenue and royalty and other accounting related costs associated with the property would not be incurred during periods when the facility was shut-in. The accountants these costs are representative of, are part of service providers and not directly employed by any of the specific producers. As such their service offerings were based on billings that were transaction driven, and therefore without production, no transactions were created to drive their billings. Hence no overhead, like accounting costs, would be incurred at the facility where the production was shut-in. The Accounting Voucher can be a further check and balance on the “decentralized production” model by ensuring that no overhead charges for the months are incurred if no production occurred.
Recall too that we have the Material Balance Report that balances the Joint Operating Committees volumetric inputs and outputs. Encapsulating these volumes within the Accounting Voucher itself as a means of enforcing the integrity of the systems balance. Where the “Material” balance, the “System” balance and the “Partner” balance for each of the participants in the Joint Operating Committee are as integral to the Accounting Voucher as debits and credits.
And the Purchase Order system that provides a means in which to control the costs for large projects. Ensuring that the contracts that govern these projects are adhered to in terms of payments, with-holding's and discounts. I think the Purchase Order capabilities provided, through an effective user interface, in the Accounting Voucher will provide significant value for the Joint Operating Committee.
We have also introduced the concept of costing the earth science and engineering resources of a producer firm to the joint account. These are in replacement to the overhead allowances that are provided for today. To charge these resources through the Accounting Voucher as a cost recovery and return on investment of the producer firms capabilities. With the elimination of the operator designation and the pooling of technical resources this charging of these resources to the joint account will be a necessary element of the pooling concept.
Lastly we have also discussed the concept of designing transactions in the Accounting Voucher. There are two different concepts here, and both are captured in the Accounting Vouchers implementation. The first is the same as the determination of who, for example, the drilling contractor, a third party or the producer will provide the product or service in the drilling contract. And the second concept is the determination of the thin crossing point of where the transaction should occur between the two firms. Although we want to select the “thinnest” point, with today’s Information Technologies we can also populate the transaction with a variety of data that makes for a much more valuable interaction between firms.
That brings to a close a quick high level review of the points to date in the Accounting Voucher module of the Preliminary Specification. We will commence our fourth, or capabilities, pass tomorrow.
For the industry to successfully provide for the consumers energy demands, it’s necessary to build the systems that identify and support the Joint Operating Committee. Building the Preliminary Specification is the focus of People, Ideas & Objects. Producers are encouraged to contact me in order to support our Revenue Model and begin their participation in these communities. Those individuals that are interested in joining People, Ideas & Objects can join me here and begin building the software necessary for the successful and innovative oil and gas industry.
Please note what Google+ provides us is the opportunity to prove that People, Ideas & Objects are committed to developing this community. That this is user developed software, not change that is driven from the top down. Join me on the People, Ideas & Objects Google+ Circle (private circle, accessible by members only) and begin building the community for the development of the Preliminary Specification.